Full View Garage Door in Bangkok | Project OZ-101382

Project Overview

Project OZ-101382 records 1 set of Full View Garage Door in Bangkok. The recorded opening size is 6000W x 2000H. Full View polycarbonate panels installed inside a residential parking area

Project Details

Project RefOZ-101382
Project UseResidential
Door TypeGarage Doors
ProductFull View Garage Doors
ConfigurationFull View polycarbonate panels installed inside a residential parking area
Size6000W x 2000H
Quantity1
LocationBangkok
IndustryHousing Estate / Developer
ClientRojanan Co., Ltd
Completion Date2026-05-03

Project OZ-101382 documents the installation of Full View Garage Door in Bangkok for a residential parking area. The page uses the same verified project data and site-photo set as the Thai version.

This reference page is based on verified project records and site photographs. The project code is used to keep the installation traceable without adding unverified customer or performance claims.

Verified project scope and dimensions

The recorded opening is 6000W x 2000H mm for one door set.

The recorded quantity is 1 set, with the documented size shown as 6000W x 2000H. These values provide a practical comparison point, but final dimensions must always come from a site survey.

Installation details shown in the photographs

The project photos show a wide aluminum-framed door with translucent polycarbonate panels, allowing daylight into the parking area while maintaining a defined entrance.

The English version retains the same selected images and image order as the Thai project page. The photographs support the visible installation details while the product type, quantity and dimensions remain grounded in the project record.

Planning points for a similar installation

A wide Full View opening requires the frame lines, panel divisions, tracks and available headroom to be coordinated with the facade and ceiling structure.

Before manufacturing or installation, OZ Door recommends confirming the finished opening, surrounding structure, clearances, power and control locations, traffic direction and applicable safety devices for the actual site.